INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Asphalt Concrete Pavement Design

Asphalt Concrete Pavement Design

Asphalt Concrete Pavement Design

(OP)
I'm working on a project in California and have designed the AC pavement sections using the Caltrans method. I've also calculated the structure sections using the AASHTO methodology. In order to design the AASHTO sections, I've used the empirical relationship recommended by AASHTO to convert resistance value to resilient modulus. Overall, the AASHTO method produces comparable to slight thicker AC sections, but yields significantly thinner baserock sections.

The AASTHO method pavement section thickness is slightly affected by using a low value of the drainage coefficient, m. However, I've also read that it's not really appropriate to use a low value for m (say 0.4) for poor drainage conditions, as compared to using a value of 1.0 for average drainage conditions.

I know that the Caltrans resistance value used in the design represents a saturated condition, and therefore the worst-case condition. However, the AASHTO baserock section varies as much as 75 percent less than the Caltrans section.

Any similar experiences between the two design methods?

Does anyone know if AASHTO recommend a minimum baserock section regardless of calculation, and if so, what is that thickness?

Also, does AASHTO recommend using a geosynthetic separation fabric between the base and soil subgrade?

Thanks



RE: Asphalt Concrete Pavement Design

It's been about 12 years since I did an AASHTO pavement design calculation and I don't remember all of the details. The calculation was for a federal prison in California, where I'm based. The Federal Bureau of Prisons required AASHTO for this project, but I also did a Caltrans calculation for comparison. My notes are stored away and I can't get to them easily, but as I recall my results were similar to yours in that Caltrans had thicker baserock and thinner AC than AASHTO. Since its easier to add AC than baserock to as existing pavement section (e.g. for future maintenance), I used the Caltrans design and justified it to the FBOP.

==========
"Is it the only lesson of history that mankind is unteachable?"
--Winston S. Churchill

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.