INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

ASME Sect I: Master data report problem

ASME Sect I: Master data report problem

ASME Sect I: Master data report problem

(OP)
Dear All,

I'm a novice in boiler and have a problem with ASME Sect I master data report.

In ASME Sect I, Form P-3 (Manufacturer's Data Report for Watertube Boilers, Superheaters, Waterwalls, and Economizers) there is two options to be checked, whether it's master data report (yes) or not.

We have some boiler now that installed in field by different shop manufacturer.
In my understanding, form P-3 will be provided by shop manufacturer (master data report will be checked yes) and form P-4 will be provided by field installer.

But the shop manufacturer checked the 'no' box and insist on it, they argue that they don't certifying steaming capacity of full boiler. Honestly, I don't clearly understand what that means. Are they implying that the field installer who should tick 'yes' box? Isn't that a shop manufacturer responsibility as the boiler is already passed the tests in shop?

Please kindly share your view and experience on this.

Kind regards,
Janteloven

RE: ASME Sect I: Master data report problem

Who provided the Pressure Relief Valve?.Who designed the Boiler? In my opinion the Boiler Manufacturer has to satisfy the Steaming capacity (MDSC) of the boiler. Unless this Mfr did not install the tubes. in other words the shop Mfr did not finish the boiler. If the designer is the responsible one for the finished product and can be and A or S ASME Certificate Holder
then one of this two has to provide the MDSC.

RE: ASME Sect I: Master data report problem

(OP)
Hi GenB,

Thanks for your view. The shop manufacturer is the one who designed and will provide the relief valves.
The boiler is finished at shop, and then delivered to the site. In site, the field installer only erected it and installed the external piping.

In that case, isn't shop manufacturer responsible for it?

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources