INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Welding/edge preparation in NX 8.5

Welding/edge preparation in NX 8.5

Welding/edge preparation in NX 8.5

(OP)
Hi

For butt welding of pipes, we have to make edge preparation at their end , say 30 deg.
If thickness is high, then the angle changes to 45 deg for initial 10mm and then 10 deg for remaining thickness

How do I make a database of same ?
My idea is, if I specify the pipe od and thickness and edge, the edge preparation should appear at that point automatically. How can i do it?

Also, there is another case, where one tube is welded to another one, to make a branch.
It is inserted some 5mm into the main pipe body. For that I have to make a groove in the pipe and insert the second one.
I have a database for groove sizing based on second pipe dimensions?
How can i automate the process?

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources