Hello
For welding a join with PJP, do we have qualication a WPS?
Thank you
For welding a join with PJP, do we have qualication a WPS?
Thank you
INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS Come Join Us!Are you an
Engineering professional? Join Eng-Tips Forums!
*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail. Posting GuidelinesJobs |
PARTIAL JOINT PENETRATION
|
RE: PARTIAL JOINT PENETRATION
You can make use of a Pre-Qualified WPS as per Sec.3 of AWS D1.1 Code provided that your construction code is AWS D1.1 and the welding variables are with in the range specified in the code .
RE: PARTIAL JOINT PENETRATION
As you have posted in the ASME section then yes, you do need a qualified WPS,