What exactly is S stamping?
A component is manufactured. (It is a part of piping, which will be installed at site.)
What all things are to be done to get it S stamped.
A component is manufactured. (It is a part of piping, which will be installed at site.)
What all things are to be done to get it S stamped.





RE: S stamping
RE: S stamping
I have seen that.. i think it is pg-106.
that stamp talks about boiler maximum allowable working pressure, heat transfer area etc and seems to be for a full boiler assy
in my case, boiler components are to be shipped part by part..
then what shall i affix as s stamp and where on the componet?
what details, the stamp should have then
can u send a sample s stamp pic..
RE: S stamping
Please refer to Section I and your Authorized Inspector. They can guide you.
RE: S stamping
i believe we can supply component without S stamp also.. but then what is the specific use of S stamp?
i have seen vessels (fire tube boilers totally manf and assembled in shops) with s stamps.
but if i am sending it part by part, how will i do it
RE: S stamping
My recommendation is to stay out of supplying boiler pressure parts because without an S-Stamp you will have a problem. You need to understand what is required, and this is not the place.