Auxiliary view break line
Auxiliary view break line
(OP)
The break line that is being created for an assembly view is not centered on the pipe.
The Anchor pipe is centered.
How can this be fixed?
D.Sauve
The Anchor pipe is centered.
How can this be fixed?
D.Sauve





RE: Auxiliary view break line
RE: Auxiliary view break line
RE: Auxiliary view break line
John R. Baker, P.E.
Product 'Evangelist'
Product Engineering Software
Siemens PLM Software Inc.
Industry Sector
Cypress, CA
Siemens PLM:
UG/NX Museum:
To an Engineer, the glass is twice as big as it needs to be.
RE: Auxiliary view break line
RE: Auxiliary view break line
John R. Baker, P.E.
Product 'Evangelist'
Product Engineering Software
Siemens PLM Software Inc.
Industry Sector
Cypress, CA
Siemens PLM:
UG/NX Museum:
To an Engineer, the glass is twice as big as it needs to be.