INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Bridge pier failure mode.

Bridge pier failure mode.

Bridge pier failure mode.

(OP)
I work on bridge seismic retrofit. The pier in question is very short, only 10 feet from top of pilecap to the soffit of superstructure. Cross-sectional dimensions 8'x9', almost a cube. In dynamic analysis the pier was modeled as a beam element and assessed as a such show that plastic hinge has a significant ductility demand governed by stresses in reinforcement. Shear reinforcement is adequate for shear but does not satisfy confinement requirements.
What will be a reasonable way to assess this pier? By proportions it's not qualified to be treated as flexural element.

Thank you for responses!

RE: Bridge pier failure mode.

Given the dimensions you might be better of modelling it as a plate as it's more of a rigid body then anything else. I would bet if you were to check it for overturning the dead load alone would counteract any overturning force and so there would be next to no tensile stresses acting on the concrete.

But that's just a thought.

RE: Bridge pier failure mode.

I think you hit the nail on the head, the stiffness of the stubby pier will attract load so if you need it to function for plastic design, it needs to be able to dissipate energy and therefore good confinement is necessary. I suggest wrapping the column for additional confinement.

VoD

RE: Bridge pier failure mode.

Strut and Tie.

RE: Bridge pier failure mode.

Hi Yakpol -

For this stubby pier, a rigid link would be applicable in the analysis, with the resulting shears then applied to a dimensionally correct plate element. Strut and tie would be a good method to determine the reinforcing.

Regards,
Qshake
pipe
Eng-Tips Forums:Real Solutions for Real Problems Really Quick.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources