INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

How to show no increase in runoff

How to show no increase in runoff

How to show no increase in runoff

(OP)
I am working on a project and we need to either show there is no increase in stormwater runoff to the NYSDOT ditch or install a detention pond to control the runoff so it matches the predevelopment rates. All of my other projects have required a detention pond but I think this one may not as the existing soils have a decent perc rate and the projects sits far enough from the road that the runoff will have time to perc into the existing soils prior to reaching the ditch.

My questions is how do I determine this? My pre development runoff is .078 af with a 1.07 cfs flow. My post development runoff is .081 af with a 0.91 cfs flow. So my volume is slightly more but my flow rate is less. So the volume of runoff increases by .003 but my flow rate decreases by .15 cfs. Therefore, the project will not have an impact on the DOT ditch as the post development flow entering the ditch will actually be less than the pre development flow. Am I interpreting things correctly?

Thanks.

RE: How to show no increase in runoff

I'm not exactly sure if you're asking how to model this, how to compare pre/post, the effect on the ditch, or something else...

If the DOT is only concerned with peak flow, they will presumably accept your design. Of course, peak flow isn't the only factor that may have downstream effects. Since the volume is increased, there must be an increase in flow duration, with a corresponding increase in erosion potential. It all depends on the specific site issues and the DOT requirements.

Peter Smart
HydroCAD Software
www.hydrocad.net

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources