INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

weld overlay post weld heat treatment

weld overlay post weld heat treatment

weld overlay post weld heat treatment

(OP)
hi all,

Welding parameters are as follow:
Base metal: SA 350 LF2 (P No.1 & Gr. No.2)
Base metal thickness: 40mm
Overlay Incoly 625 and Overlay thickness: 3.5 mm
Filler metal: ERNiCrMo3 (AWS A:5.14 & F No.43)
Position: 1G
Pre-heat: Ambient & Inter-pass temperature : 200◦C max
Code: ASME IX

My question is that "PWHT is required or not ? Please advise me with code reference (ASME IX).

Regards

RE: weld overlay post weld heat treatment

First, ASME B&PV Code, Section IX does not determine PWHT requirements, this is spelled out in one of the code of construction book sections, like, ASME Section I, or Section III, or Section VIII or ASME B31.1......

Second, ASME Section IX is a service code book section that provides the requirements for qualification of a welding procedure with or without PWHT, impact qualification and welder performance qualification, similar for brazing and now fusing of plastic or GRF pipe are considered.

RE: weld overlay post weld heat treatment

(OP)
As per ASME Section VIII, which clause specifies about it?
Regards

RE: weld overlay post weld heat treatment

metboss, see Parts UCS and UNF

Regards,

Mike

RE: weld overlay post weld heat treatment

Refer to ASME Section VIII Div 1, Table UCS 56

RE: weld overlay post weld heat treatment

According to ASME Section VIII Div 1, Table UCS 56, for Carbon Steel Welding:
• Preheating nor PWHT is required for plates < 1.25”.
• Preheating (200F min) can be done in lieu of PWHT for plate 1.25 – 1.5” thick.
• Preheating (200F min) and PWHT is mandatory for plates >1.5” thick.

RE: weld overlay post weld heat treatment

Please review UCS 56-1 General Note 3(e)

(e) for corrosion resistant weld metal overlay cladding or for welds attaching corrosion resistant applied lining (see UCL-34)
provided preheat to a minimum temperature of 200°F (95°C) is maintained during application of the first layer when the thickness
of the pressure part exceeds 11/4 in. (32 mm).

RE: weld overlay post weld heat treatment

(OP)
Thanks to all,

metengrs,

so in our case, PWHT is not required if we maintain pre-heat temperature 200°F (95°C minimum ) during application of the first layer??

RE: weld overlay post weld heat treatment

Also review Part UCL, UCL-34.

RE: weld overlay post weld heat treatment

You need Preheat & PWHT for your base metal. But only preheating for your overlay.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources