INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Industrial engineering common times

Industrial engineering common times

Industrial engineering common times

(OP)
I need to know if there are tables available that show how long the average human being takes to perform a certain task.  Specifically, I need to know how long it takes someone to install 5 nuts and washers to a threaded stud.  We perform time studies at my company, but we are looking to standardize times for certain elements across the company.  I need to know if there are published industrial engineering standards that list times for tasks that are common to a manufacturing facility.

RE: Industrial engineering common times

Try with MTM or MTM 2 methods (Method time measurments). The whole procedure is divided to a basic particles which have it's own values (TMU's). Just imagine that all that work is sequenced in a smaller parts For explanation:

Reaching for a part is 16 TMU's
Grabing a part 3 TMU's

and so on. When you split whole procedure, define it with times for each, then add some time for other factors (multply with 1.3854, i think :) ). This time is the real time for making this job.

Also on Net there are avilable software that do this for you (TiCon, ProCon etc.)

RE: Industrial engineering common times

I suggest that you develop your own standard times using
MTM or Work Factor. It is a very simple exercise. Any
pick up and place with one hand takes about .05 min. There are MTM tables that you can use. The same goes for Work Factor. Work Factor uses larger units of measurement and for me was a lot easier to use. Both are good.

RE: Industrial engineering common times

Does anyone know where I can find the MTM tables, preferably for free or cheap?

RE: Industrial engineering common times

You may be able to get what you need at the library of a local engineering college. However, the books you find on predetermined time standards may only consist of a good summary on how to use (MTM, MOST, Modapts, etc.)and some examples. This may be all you need for your purpose, but it might not be. The only place I have seen complete data is to purchase it from Maynard.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources