What does the connection of a new RCP to an existing Junction Chamber look like?
This would be a situation where a new hole is cut into the existing Junction chamber and the new 72" RCP connected to the junction chamber (about 16'x16').
Sorry if this is basic but I'm just trying to understand what this typical detail looks like. Even for new construction.
Thanks
This would be a situation where a new hole is cut into the existing Junction chamber and the new 72" RCP connected to the junction chamber (about 16'x16').
Sorry if this is basic but I'm just trying to understand what this typical detail looks like. Even for new construction.
Thanks





RE: RCP to Existing Junction Chamber
RE: RCP to Existing Junction Chamber
RE: RCP to Existing Junction Chamber
RE: RCP to Existing Junction Chamber
I'm trying to understand what the typical connection looks like between the pipe and the wall of the chamber for a retrofit condition or even new construction. Is there typicall just grout between the pipe and the wall or is there some other sort of connection with usually ties the two together?