INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

post installed anchor concrete pullout

post installed anchor concrete pullout

post installed anchor concrete pullout

(OP)
I am looking for information on determining the concrete pullout strength for a post installed anchor. My situation is a little out of ordinary. I am very familiar with ACI 318 Appendix D however my situation is not covered. I have a steel bracket bolted to concrete. The bracket load induces a moment on the connection. The moment is transfered via tension in a post installed mechanical wedge anchor and compression between the edge of bracket and the concrete. The tension load on the anchor is about 4 times the external load due to the prying. The tensile load on the anchor and the compressive load on the concrete are typically 1 to 2" apart. The anchors are embedded 3 to 4" so the compressive load falls into the concrete breakout cone(mode that always controls the design). I know this compressive load will help with the concrete breakout but I do not believe it is as simple as taking the differnce between the anchor tensile laoding and the compressive concrete loading as the loads are not concentric. Anyone aware of any methods or references for this scenario?
thanks

RE: post installed anchor concrete pullout

I would count on this qualitatively only as something in your back pocket to take the interaction ratio up to 1.0. I've never seen any literature that addresses how to account for this interaction.

On a different note, if the tension is being amplified by a factor of 4 due to prying, then I would look at a new arrangement. That seems way too high and could end up being even higher if small dimensional changes occur during construction.

RE: post installed anchor concrete pullout

The interaction between the bracket and the concrete depends on the stiffness of the bracket. Your problem is partly a base plate design problem since you are wanting the pressure distribution from the bracket to resist breakout. I'm not sure that this interaction is intuitive and it might be highly variable depending on variable geometry during construction.

As you probably know, post installed anchors are proprietary, especially the mechanical ones and they don't always behave like embedded or chemical anchors. It doesn't seem like understanding the failure mode you describe would be a rewarding endeavor.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources