INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

ASME Sec 1 Parts

ASME Sec 1 Parts

ASME Sec 1 Parts

(OP)
Received Boiler proper(Pipe Spools)supplied by a CODE manufacture C/W P4 material supplied as PARTS. ASME Section 1 PG-106.8.1 Marking of Parts lists four items that have to be stamped on the part see listed below. The piping received is under 5" OD (3" OD) so PG-106.8.2 applies are the four items listed below still mandatory or is the part serial # only traceable to the P4 acceptable.

(a) Certification Mark above the word "part"
(b) certified by (name of Manufacturer)
(c) Manufacturer's serial number of the part
(d) year built

RE: ASME Sec 1 Parts

P-4 is signed by an AI, items should be stamped with the proper mfr, s.n. yr. Mfr. ASME Mark and designator. AI is witness of all the above. Your parts may be rejected buy the final assembly AI, ask him or her.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources