INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Wind Loads: Guide to the Wind Load Provisions of ASCE 7-10: Errata and Questions

Wind Loads: Guide to the Wind Load Provisions of ASCE 7-10: Errata and Questions

Wind Loads: Guide to the Wind Load Provisions of ASCE 7-10: Errata and Questions

(OP)
I just purchased a copy of Wind Loads: Guide to the Wind Load Provisions of ASCE 7-10 and I am going through it to more fully
understand the ASCE 7-10 wind load provisions.

A couple of things I noticed:

1. Table G5-13 on page 65, the negative signs for the coefficients
appear to be missing 2 thru 6E.
2. The last paragraph on page 65 states that "or 2.5h, whichever is
less." Shouldn't that height be the eave height at the windward wall
and not the mean roof height?

Also a general question on Note 8 of Fig. 28.4-1. It states "that if
negative then apply for a distance from the edge of the roof equal to
..." is this distance applied horizontally or along the slope of the
roof. As it is drawn in Fig. G5-7 it is along the slope.
However, if this is the case, when Zone 2 or Zone 2E is negative this
condition will always apply regardless of the eave height since the
distance along the slope of the roof will always be greater than half
the building width (unless of course the roof is flat). Was this the
intent of the code authors?

In regards to this same question if there is a roof overhang do you
measure from the building edge or the overhang edge for this distance?
I guess I should probably ask first if the envelope procedure is allowed
for buildings with overhangs, I assumed it does but I could be wrong.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources