I am designing a pipe column with a moment connection at the base. For the ease of construction i am looking a having a size larger pipe shop welded to the beam the column is landing on, that way in the field they can just lower the column into the sleeve, single pass weld around and go on.
The question I have is what is the best way to determine the pipe length mainly and wall thickness. My initial thought was to make the sleeve length twice the diameter and same wall thickness as column but was trying to find a way to put some numbers to it.
Thank you for any help
The question I have is what is the best way to determine the pipe length mainly and wall thickness. My initial thought was to make the sleeve length twice the diameter and same wall thickness as column but was trying to find a way to put some numbers to it.
Thank you for any help






RE: Pipe sleeve moment connection
It might be better to use a backing ring tacked to the beam, prepare the end of the pipe and make a full penetration weld. You only weld once and have the benefit of having the backup ring in place. The backing rings are sized for the inside of the pipe.
Michael.
"Science adjusts its views based on what's observed. Faith is the denial of observation so that belief can be preserved." ~ Tim Minchin
RE: Pipe sleeve moment connection
RE: Pipe sleeve moment connection
Michael.
"Science adjusts its views based on what's observed. Faith is the denial of observation so that belief can be preserved." ~ Tim Minchin