In DOE method,
if slump has been specified as 30mm. so, should i take (10-30)mm interval datas
Or
(30-60)mm interval datas for my calculations.
if slump has been specified as 30mm. so, should i take (10-30)mm interval datas
Or
(30-60)mm interval datas for my calculations.





RE: Concrete Technology DOE method
size.Can any one suggest where can i get specification table for aggregates of 40mm Nominal Maximum size.