INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Valve, change schedule by weld overlay

Valve, change schedule by weld overlay

Valve, change schedule by weld overlay

(OP)
Hello,

I have a 20" #1500 PSV Gate valve. The schedule of but weld ends should be changed from 120 to 160. and then this valve will be welded to pipes.
I want to know if there is any PWHT requirements for this.
Also is this allowed to overlay around 12mm (change sch from 120 to 160 for 20") then PWHT and then prepare the but weld end to weld to the pipe? any requirement in ASME B31.3 for PWHT and preparation?

appreciate your advise.

MRSohrabi;
Materials and Welding Eng.

RE: Valve, change schedule by weld overlay

No.

RE: Valve, change schedule by weld overlay

I'm assuming it's Carbon Steel.

Carbon Steel over 3/4" thick requires PWHT as per ASME B31.3.

20" Sch 120 is 1.5" thick.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources