INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

boiler operating pressure requirments

boiler operating pressure requirments

boiler operating pressure requirments

(OP)
hello good day. Currently, our power boiler is operating at 33 bars, 370C superheated steam, steam flow at 32 ton per hour. supplying steam to steam turbo-generator, extraction type.

I want to purchase a packaged type boiler to serve as back-up in case the big boiler will be subjected for repair works. The small boiler will supply steam to process only.

Can anyone suggest what will be small boiler specification?

RE: boiler operating pressure requirments

33 bars, 370C superheated steam, steam flow at 32 ton per hour.

Unless you want to run your generator at some lower efficiency (use non-superheated steam) or lower rating (provide less steam pressure and less steam flow) your temporary boiler will have to be the same rating as the current boiler. How could it be different?

Warning, deliberately running "wet" saturated steam for long periods of time into a turbine designed for superheat properties and flows will likely void warranties.

RE: boiler operating pressure requirments

How much steam at what quality is being take off for process use?
That is your question.

= = = = = = = = = = = = = = = = = = = =
Plymouth Tube

RE: boiler operating pressure requirments

Good point. Thank you for the correction.

RE: boiler operating pressure requirments

(OP)
Small boiler will supply only steam to process dept.

at Pressure reducing and desuperheating station one, 3 kg/cm2 180 C, the total steam flow req is 23 TPH.

at pressure reducing and desuperheating station two, 6 kg/cm2 350 C, the total steam flow req is 5 tph.

So what will be the small boiler specifications base on these req? ponder

RE: boiler operating pressure requirments

6 kg/cm2 at 28 tph, plus design margin to ensure releif valves do not lift. Find out the desing pressure for the piping from the steam turbine extraction nozzle to the 6kg/cm2 process, and that would be the design pressure for teh steam exiting the new boiler. The boiler's "master stamping pressure" may be 5% higher than that steam pressure.

"Whom the gods would destroy, they first make mad "

RE: boiler operating pressure requirments

(OP)
thanks davefitz

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources