Dish to shell welding has been completed RT results pass, but while visual inspection, one of my friend saw that there no taper has been done on that joint there 4 mm difference in dish head thickness and shell thickness, should we need to reject that joint or need to accept, give me the reference.
Best rgds
I need your answer,
Dish to shell welding has been completed RT results pass, but while visual inspection, one of my friend saw that there no taper has been done on that joint there 4 mm difference in dish head thickness and shell thickness, should we need to reject that joint or need to accept, give me the reference.
Best rgds





RE: ASME Sec 8 Div 1 Vessel 4:1 Transition Head to Shell is not done
If you want more help, pls provide a sketch with all the relevant dimensions (including the position of the tangent line and geometry of the weld).
prex
http://www.xcalcs.com : Online engineering calculations
http://www.megamag.it : Magnetic brakes and launchers for fun rides
http://www.levitans.com : Air bearing pads
RE: ASME Sec 8 Div 1 Vessel 4:1 Transition Head to Shell is not done
RE: ASME Sec 8 Div 1 Vessel 4:1 Transition Head to Shell is not done