INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

clip or bolt hold down for process skid

clip or bolt hold down for process skid

clip or bolt hold down for process skid

(OP)
I have a number of chemical process skids under my control and they are fixed down to the concrete with an inverted angle which is then bolted down thru a hold down bolt into the concrete. Underside of skid is grouted to the concrete in the vicinity of the hold down. About 3 per side of skid.
This is presumably to allow the skid to expand due to thermal loads, either sunlight or process heat.
The piping comes from a piperack nearby, which could be considered as rigid. However given the amount of air between the skid and the pipework, I don't think the process heat would govern.
The skids are reasonably small, about 10 metres (33 feet) long.
Seismic and wind loads are negligible, I think friction would be enough to stop them sliding and the angle would prevent overturning.
Still I am surprised they don't have a conventional hold down bolt thru the skid flange.
Does anyone have any ideas?

RE: clip or bolt hold down for process skid

Bob116:
Show us a cross sectional sketch through the skid side sill and these angles and the slab. I’m not sure I understand what you trying to tell us. Loads, dimensions, reasonable proportions please, they help us get a feel for the problem. It sounds like a pretty quick and dirty way of holding the skid down and within some confined location set by the angles which are bolted down, but otherwise it’s kinda loose and allowed to move laterally within those vert. angle legs. They don’t need to set anchor bolts very accurately on two 33' parallel lines, to match the side sill flange holes. There should be some pipe stress analysis engineering involved in this kind of system, ask them about this. And, too much movement of these skids might do more damage to the pipes than the other way around. Alternatively, if they’ve been doing it this way for years, and it works on this equipment, what do we know?

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources