Eliminating Energy Wasting Devices
Eliminating Energy Wasting Devices
(OP)
Greetings
I'm looking for drawings or description of chilled water systems that uses a minimal of balancing valves and cross-over bridges; as close to an example of an actual installation as I can get.
I have handbooks with schematics and explanations of two-way control valve systems that elimanted all balancing and cross-over bridges (for increased efficiency) but I do not have experince with such systems.
Thank You
I'm looking for drawings or description of chilled water systems that uses a minimal of balancing valves and cross-over bridges; as close to an example of an actual installation as I can get.
I have handbooks with schematics and explanations of two-way control valve systems that elimanted all balancing and cross-over bridges (for increased efficiency) but I do not have experince with such systems.
Thank You





RE: Eliminating Energy Wasting Devices
http://www.kele.com/templates/content.aspx?id=4946
http://www.kele.com/templates/content.aspx?id=4942
http://www.kele.com/WorkArea/linkit.aspx?LinkIdent...
http://www.kele.com/WorkArea/linkit.aspx?LinkIdent...
http://www.kele.com/WorkArea/linkit.aspx?LinkIdent...
http://www.kele.com/WorkArea/linkit.aspx?LinkIdent...
Best to you,
Goober Dave
Haven't see the forum policies? Do so now: Forum Policies