INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

FFS and PCC Code

FFS and PCC Code

FFS and PCC Code

(OP)
Dear all,

Can somebody explain what is the limitation in between of FFS (API-579) and PCC, whether both of them can be applied only for in service plant ?


Thanks,
Yogie

RE: FFS and PCC Code

API-579/ASME FFS is the code governing Fitness for Service applications. It basically describes the tests which can be done to allow equipment with some damage to continue operating even if they are below their construction code requirements.

PCC are Post Construction Codes. There are 2. PCC 1 is a guideline for assembling bolted joints.

PCC 2 refers to the requirements for conducting repairs to Pressure equipment, either for temporary or permanent repairs. These are repairs required after failing a Fitness for Service assessment, or if the user decides they want to repair even if it can be proven to be fit for continuation.

RE: FFS and PCC Code

(OP)
Hi Ripz,

Thank you, regarding flange misalignment is this requirement mandatory to be followed since my understanding this alignment shall be adjusted during construction not in service or post construction or during reinstatement after breaking containment.

RE: FFS and PCC Code

Your construction code will have it's requirements for flange alignment which has to be adhered to at the construction phase.

Anything after the construction phase does not require you to follow the construction code. Which is where the equipment user has to decide what practice to follow for post-construction activities eg. maintenance etc.

Unless you have a contractual agreement/local legislature/insurance requirement, you do not need to follow any particular code. But best practice would advise you to follow a documented procedure based on sound engineering judgement.

RE: FFS and PCC Code

Quote:

PCC are Post Construction Codes. There are 2. PCC 1 is a guideline for assembling bolted joints.
There's a 3rd, PCC-3:2007; "Inspection Planning Using Risk-Based Methods".

RE: FFS and PCC Code

Thanks XL83NL. I did not know this. I wonder if it's as good as API-580.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources