INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Necessary to remove pavement striping before paving?

Necessary to remove pavement striping before paving?

Necessary to remove pavement striping before paving?

(OP)
The roads on our project will be constructed at the beginning of a multi-year phased construction project. The owner has opted to place the final pavement lift at the end of the project (probably 3 years after the first pavement lift is placed). We are going to stripe the roads with the initial pavement lift. Striping will be glass-bead, non-thermoplastic paint.

Is it necessary to remove this striping prior to placing the final overlay? My hunch is that it's okay not to - cleaning the road of debris and a good tack coat will provide sufficient bond between the initial pavement lift and final overlay lift. Am I missing something?

Thanks!

RE: Necessary to remove pavement striping before paving?

After 3 years of weathering, should be OK. If thermoplastic...remove it.

RE: Necessary to remove pavement striping before paving?

I agree with Ron.

Mike Lambert

RE: Necessary to remove pavement striping before paving?

On the subject of pavement striping, I often see cracking along the edges of the lines. The lines are white, and the asphalt is black, so I assume it is thermal cracking. This is on relatively thin layers, e.g. rural roads, sports courts. Is this from using inappropriate coatings, or what?

RE: Necessary to remove pavement striping before paving?

hokie66....you are correct. It is thermal related, but mostly a weathering issue from differential heating. The asphalt volatizes through its life, more in the early part than laters. The stripes are paint....they are also white or yellow, so the absorb less heat. Further, they protect the asphalt underneath so that it gets less weathering than that surrounding the stripes. Result is shrinkage of the asphalt from the weathering, causing a separation or crack at the stripe interface.

RE: Necessary to remove pavement striping before paving?

So are there solutions to this problem? Are there better materials which minimize this problem, or it is just inevitable that this will happen with time?

RE: Necessary to remove pavement striping before paving?

I don't know of any solutions thus far. Many materials have been tried, but the resistance to traffic abrasion wins out over the shrinkage issue.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources