INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

PWHT of existing equipment

PWHT of existing equipment

PWHT of existing equipment

(OP)
Hi.
We are doing additional nozzle installation on existing equipment which was undergone PWHT 10years before due to installed material. Can we do the local PWHT after installation of nozzle?. Is it require to check the material strength before local pwht? If yes what parameters needs to be checked.

RE: PWHT of existing equipment

?1. Yes
?2 No

RE: PWHT of existing equipment

It all depends on what base metal is. For low alloy, I believe you will need to review the PWHT simulation cycles originally done on coupons to see if you exceed the cycles.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources