INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Required embedment for a timber pile into a concrete pile cap.

Required embedment for a timber pile into a concrete pile cap.

Required embedment for a timber pile into a concrete pile cap.

(OP)
I am trying to find a detail for timber piles into a concrete pile cap. I searched our company library, the Timber Piling Council, and checked Google and could not come up with a detail with confidence.

Basically we have 12" timber piles with a concrete pile cap on grade supporting a shallow water tank. There is no uplift and very little shear in the cap. Does anyone know a reference for the connection of the piles to the cap?

Is this detail as simple as saying embed the pile 6"
Or is there an obscure code requirement that we need to run rebar thru the top?

Thank you

RE: Required embedment for a timber pile into a concrete pile cap.

If there is no uplift and negligible shear then technically you wouldn't need more than that kind of embedment. But in all honesty is it that hard to drill a hole through the top of the pile and stick a piece of rebar through? The piece of mind would be worth it on its own.

RE: Required embedment for a timber pile into a concrete pile cap.

6” is the standard most places I’ve worked (it’s also in the CRIS handbook). Of course, a factor in that would be the force transfer you were trying to do…..if those forces were very low/almost nonexistent than you would fall back on the 6”.

RE: Required embedment for a timber pile into a concrete pile cap.

Pardon, I meant the CRSI handbook (above).

RE: Required embedment for a timber pile into a concrete pile cap.

The PADOT min. embedment is 1'-0" unless it is a single row of piles in which case it is 1'-6". Probably because I have been using that standard for over 30 years that 6" seems skimpy.

RE: Required embedment for a timber pile into a concrete pile cap.

(OP)
Thanks everyone for your opinions so far.
I have expanded my google searching and have come up with a few references that are right in line with what has been said

6" - Design of Marine Facilities for the Berthing, Mooring, and Repair of Vessels
4" embedment minimum for piles not in tension - ASCE/SEI 24-98 Flood resistant design and construction -
12"-24" depending on the situation - Ohio DOT:
6" - CRSI

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources