INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

12 kV 3 Phase, 3 Wire Campus Loop

12 kV 3 Phase, 3 Wire Campus Loop

12 kV 3 Phase, 3 Wire Campus Loop

(OP)
We are attempting to get the serving Utility's approval for an interconnect agreement for a photovoltaic system installed on a building served by a customer owned 12 kV, 3 Phase, 3 Wire with 1 grounding conductor Campus Loop. The campus is primary metered with the primary meter and (2) customer owned 12 kV interrupter switches located at a remote location on the campus. The service point is on the line side of the customer owned 12 kV interrupter switches. The campus has one (1) large building served by multiply Delta-Wye transformers (12 kV - 480/277Y). In order to receive approval from the utility, the utility is requiring the campus to switch all 12 kV-480/277Y transformers serving a photovoltaic installation via the electrical distribution equipment, i.e. 480/277 volt distribution panelboards from a Delta-Wye to a grounded Wye-grounded Wye transformer. The utility's concern is the contribution from the photovoltaic system to the available fault and high phase voltages. Please note; this presently does not require all Delta-Wye transformers serving the campus to be replaced.

Providing a grounded wye-grounded wye transformer supplied by an ungrounded, medium voltage distribution feeder create any negative issues? Does establishing a ground at the high side of the wye-wye transformer without a neutral conductor to the service point create any issues? I would like to verify the installation of a grounded wye-grounded wye transformer will not negatively impact the campus loop or the electrical distribution equipment served by the same.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources