I-43 /Fox River Bridge Green Bay
|
RE: I-43 /Fox River Bridge Green Bay
Sink hole? It will be interesting...
Mike McCann
MMC Engineering
RE: I-43 /Fox River Bridge Green Bay
Corrosion seems the cause.
http://www.wearegreenbay.com/1fulltext-news/cause-...
RE: I-43 /Fox River Bridge Green Bay
Plans for the repair can be founds here: ftp://ftp.dot.wi.gov/dtsd/hcci/plansandproposals/2...
Basically, saddling 4 of the existing piers with a combination of new drilled concrete shafts and post tensioned concrete. Steel girders on settled pier jacked back into alignment and shimmed.
RE: I-43 /Fox River Bridge Green Bay
So none of the other piers are affected? It was that "local"?
Mike McCann
MMC Engineering
RE: I-43 /Fox River Bridge Green Bay
RE: I-43 /Fox River Bridge Green Bay