INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

OWSJ Backspan?

OWSJ Backspan?

OWSJ Backspan?

(OP)
I have a 2 metre 'w' beam cantilever from a 'w' column flange. I am wondering if I can utilize the OWSJ framing into the other flange of the 'w' column as a backspan. Has anyone ever done this? If so, would you specify a joist design end moment equal to the greater of the backspan moment and gravity moment? This seems very odd to me, not quite jiving.

Another question - do you typically show a joist schedule with all joist types sorted by the different joist loads? Or do you let the joist supplier determine the loads on each joists per the loads indicated on plan?

All help is appreciated. Thanks.

RE: OWSJ Backspan?

It seems possible, but the OWSJ is not a very stiff elements, and so the column is likely stiffer which make it attract more moment. You also run into the need for more bracing of the OWSJ due to the negative moment, and possibly a fairly stocky joist. In this situation I would run a steel beam as the backspan.

RE: OWSJ Backspan?

I agree with using a beam as backspan, but another option is to splice the column above and below the beam, providing stiffeners in the beam to carry the column above.

BA

RE: OWSJ Backspan?

I wouldn't say I agree with the opinion that a steel joist is "not very stiff". I would say just the opposite.

In this particular instance I would figure out the moment of inertia needed for the backspan and then increase the moment of inertia by about 20% (figuring for shear deformation of the web) and then tell the joist manufacturer what moment of inertia I needed. You will also need to give them the end moments on the joist so they can figure the joist design properly. If you are concerned about bracing the elements of the joist then just provide some extra X bridging on each side of the joist.

If you have enough of these, this may be an economical solution, otherwise, it my be more feasible to do as BA suggested and just "stack" the columns.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources