INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Jobs

Gas injection wellhead valve open/close sequence

Gas injection wellhead valve open/close sequence

(OP)
The gas injection wellhead consists of hydraulically actuated wing valve (WV) followed by surface safety valve (SSV) and sub-surface safety valve (SSSV). We have to define the closing and opening sequence of these wellhead valves. The following sequence was proposed in the design manual: First close the SSSV, followed by SSV and then WV. The opening sequence was reverse that of the closing sequence i.e., first open the WV, followed by SSV and then SSSV. But there is difference of opinion to follow exactly the opposite of that proposed above which is normally followed for a oil producer wellhead.

Please advise the correct operating sequence of a gas injection wellhead valves.

RE: Gas injection wellhead valve open/close sequence

The SSSV is normally the last thing to be closed and first thing to be opened in either production or injection systems as they don't really like opening or closing under differential pressure. There is a real risk that the valve will not open unless there is no flow and minimal pressure difference. An injection system is a little different to a production well as you are preventing flow in two directions as opposed to one, but the SSSV is there primarily to be a lst line of defence to stop the gas coming out and needs to be treated with care and preferably not closed at all unless you really need to.

Personally I would close WV, SSV then SSSV (only closed if you have a fire or level 1 ESD) and opened in reverse sequence. If the WV is closing on flow, then it is the most likely to gradually wear and leak, but the easist to replace / repair. Flow direction doesn't realy matter.

My motto: Learn something new every day

Also: There's usually a good reason why everyone does it that way

RE: Gas injection wellhead valve open/close sequence

(OP)
LittleInch,

Thanks for your valuable insight into my query.

RE: Gas injection wellhead valve open/close sequence

Ok. You might like to put this in the petrolueum engineers section and link to this question to get other views as chemical engineering isn't probably the right forum...

My motto: Learn something new every day

Also: There's usually a good reason why everyone does it that way

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources


Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close