INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

pressure vessel estimating

pressure vessel estimating

pressure vessel estimating

(OP)
Can anyone recommend a good Pressure Vessel estimating software?

RE: pressure vessel estimating

I use Excel.

David Simpson, PE
MuleShoe Engineering

"Belief" is the acceptance of an hypotheses in the absence of data.
"Prejudice" is having an opinion not supported by the preponderance of the data.
"Knowledge" is only found through the accumulation and analysis of data.
The plural of anecdote is not "data"

RE: pressure vessel estimating

I suggest that you develop your own EXCEL spreadsheet.... use a money/weight estimate method

Configure the spreadsheet to do the following:

- Estimate wall thicknesses using ASME VIII equations in your choice of materials
- Calculate bare-vessel weight, using the head choice an corrosion allowance you want
- Add on weights for your choice of nozzles, manways etc
- Calculate a total estimated weight
- Estimate a cost based on a recent quote ( use $ per lb)
- Add 15% to the cost.... add transportation cost

If you have older cost estimates, they can be very useful

As of today, in the USA, I am currently seeing carbon steel costs at $6.00-$8.00 and stainless at about $7.00 to $11.00 per pound

Let us know about your final selection/choice......

RE: pressure vessel estimating

MJCronin,
It has been several years since I purchased any Stainless Steel, but at that time the minimum on SS was around twice CS max. Have the relative prices tended to come together in the last few years?

David Simpson, PE
MuleShoe Engineering

"Belief" is the acceptance of an hypotheses in the absence of data.
"Prejudice" is having an opinion not supported by the preponderance of the data.
"Knowledge" is only found through the accumulation and analysis of data.
The plural of anecdote is not "data"

RE: pressure vessel estimating

Older estimates can be very useful on the hardware, however, cost of manpower may not be.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources