INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Tie-Back System Design Guideline & PPCP pull out

Tie-Back System Design Guideline & PPCP pull out

Tie-Back System Design Guideline & PPCP pull out

(OP)
Can anyone direct me to a book or guidline to use for Pressure-Injected tie-backs system to be used for a waterfront retaining wall.
Also, dealing with a question as pulling out a prestressed precast pile and standing a chance of damaging the top 4 to 5 ft. I know the pull-out of the prestressed piles are very detrimental and prohibited. However, if you decide to do that what happens if you damage the top few feet section? Is it going to be salvagable or any cracks can change the stress distribution of the pile?

Thanks

RE: Tie-Back System Design Guideline & PPCP pull out

PTI DC35.1-04: Recommendations for Prestressed Rock and Soil Anchors, by the Post-Tensioning Institute

RE: Tie-Back System Design Guideline & PPCP pull out

(OP)
Thank you so much!

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources