INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

PIle to cap connection high seismic
3

PIle to cap connection high seismic

PIle to cap connection high seismic

(OP)
I have a pinned assumption of pile to cap, the auger piles extend 6" into the bottom of the cap. The piles have uplift and the longitudinal pile reinforcing is being extended into the cap to develop the bars.

Are these longitudinal bars extending into the cap required to have closed ties around them within the pile cap itself? This is a high seismic area.

RE: PIle to cap connection high seismic

3
haynewp - The short answer to the requirement of closed ties around the longitudinal bars within a pile cap is "No, not required (by codes)". However, the entire concept of how a pile SHOULD be connected to a pile cap in a high seismic area is rapidly changing based on (poor) pile-to-pile cap performance in major earthquakes.

There is growing evidence (again, for high seismic loading) that the piling themselves should project into the cap substantially more than the long accepted 4" to 6". Various agencies are adopting requirement for additional embedment. One that I am familiar with is the South Carolina DOT (parts of SC are at risk of significant seismic events). Here is a recent (November 2012) update to their Bridge Design Manual that requires more embedment:
http://www.scdot.org/doing/technicalPDFs/bridgeMem...

Here are the test results that the new requirement is based on:
http://www.clemson.edu/t3s/scdot/pdf/projects/SCDO...

Also, take a look at this article in the March 2012 issue of Structure Magazine, it may not apply directly to your project, but has interesting conclusions:
http://www.structuremag.org/Archives/2012-3/C-Stru...

It recommends using omega-shaped stirups to surround the portion of the pile embedded in the cap. This is to make the pile-to-pile cap joint more ductile under high seismic loading.

www.SlideRuleEra.net idea
www.VacuumTubeEra.net r2d2

RE: PIle to cap connection high seismic

(OP)
Thanks, coincidentally it is in SC.

RE: PIle to cap connection high seismic

Thank you SlideRuleEra! I was not aware of the pile to cap connection problems. I just skimmed the magazine article and will read it soon.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources