INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Threaded Drain Plugs on Hydrotested Equipment

Threaded Drain Plugs on Hydrotested Equipment

Threaded Drain Plugs on Hydrotested Equipment

(OP)
Couldn't quickly find a thread on this, but I wanted to confirm:

ASME hydrotest for Section VIII, Div. 1 vessels: No welding or grinding permitted after the hydrotest is complete (or the vessel must be hydrotested again). If I need to ensure that ALL the hydrotest fluid is drained from a series of tubes/returns, is it acceptable (in the eyes of UG-99) to use threaded plugs in thread-o-lets in the pipe returns so the plugs can be pulled post-hydrotest to drain the system, then re-inserted "permanently"? Is that an acceptable practice (beyond the letter of the code)?

Thanks!

RE: Threaded Drain Plugs on Hydrotested Equipment

WPratesi, threaded plugs are used all the time. I would be careful about having a number of internal, threaded plugs where future leakage could be troublesome.

Under some circumstances they may be seal welded after the hydro, and you might look at alternate ways to drain to minimize the plugs needed, such as blowing down, rolling the unit, etc.

Regards,

Mike

RE: Threaded Drain Plugs on Hydrotested Equipment

Strike an arc to the device after hydrotesting and I'm likely to be upset with you if I'm the customer.

That includes seal welding in a plug, attaching insulation support clips etc.

Better check with the customer before assuming they're going to be OK with seal welds post hydrotest.

You have to balance the potential future leakage at drains installed ONLY for the hydrotest against the risk of not draining completely post test. If you can move the vessel post test, you have more options for draining from existing flanged nozzles.

RE: Threaded Drain Plugs on Hydrotested Equipment

Yes, one of the circumstances being by agreement of all parties:)

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources