INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Multi-rotational Bridge Bearings - AASHTO LRFD Specifications - FACTORED LOADS

Multi-rotational Bridge Bearings - AASHTO LRFD Specifications - FACTORED LOADS

Multi-rotational Bridge Bearings - AASHTO LRFD Specifications - FACTORED LOADS

(OP)
As of late, many Engineers of Record (EOR) have been providing only UNFACTORED LOADS for the producers of Multi-rotational Bridge Bearings and are requiring the Manufacturer to Factor the loads for their design of these bearings. This seems contrary to AASHTO LRFD Specifications and other AASHTO documents that clearly state that the Bridge Designer (not the Bearing Producer) should determine the Factored Loads. It seems inappropriate for the EOR to put this onto the Bearing Producer who is not really qualified to determine the correct factors.

Does anyone have any comments on this???

RE: Multi-rotational Bridge Bearings - AASHTO LRFD Specifications - FACTORED LOADS

That's why we have RFI's.

RE: Multi-rotational Bridge Bearings - AASHTO LRFD Specifications - FACTORED LOADS

(OP)
We have sent out RFI's asking for the factored loads. The Engineers have refused to supply that information!!!

RE: Multi-rotational Bridge Bearings - AASHTO LRFD Specifications - FACTORED LOADS

Here's what you do, take the I factored loads from the plans, factor them, and send them to the EOR for approval. State in writing you can't start the shop drawings until the loads are approved.put the onus on him.

RE: Multi-rotational Bridge Bearings - AASHTO LRFD Specifications - FACTORED LOADS

(OP)
Yes.....that is a very good idea - except I am unsure how to factor the loads. Could you please give me some pointers on how to do this or advise me of some literature I can get to help me factor the unfactored loads?

RE: Multi-rotational Bridge Bearings - AASHTO LRFD Specifications - FACTORED LOADS

Can it wait till Monday? I'll be back in my office then. I have a copy at home but won't be there till Friday night and we have friends staying for the weekend. I hate to see you spend $500 on an AASHTO if you're not going to use it regularly.

You can try this site, they have some LRFD publications that might be useful:
http://www.aisc.org/contentNSBA.aspx?id=20244

RE: Multi-rotational Bridge Bearings - AASHTO LRFD Specifications - FACTORED LOADS

(OP)
Yes.....it can certainly wait until sometime next week. Any help or advice you could give me would be greatly appreciated.

Thank you.

RE: Multi-rotational Bridge Bearings - AASHTO LRFD Specifications - FACTORED LOADS

According to AASHTO LRFD bearings are designed for Service I, so the load factors are 1.0.

The connection of the fixed bearing to the superstructure is designed for Extreme I or II, which requires several loads in addition to DL & LL.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.