INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Fabrication of CRA overlay welded pipeline for Sour services
2

Fabrication of CRA overlay welded pipeline for Sour services

Fabrication of CRA overlay welded pipeline for Sour services

(OP)
Hi Fellows,
I have two questions regarding the CS pipeline overly with alloy 825 for sour services:
1.Do we need to use CS NACE comply material (HIC and SCC tested) for base material?
2. After alloy 825 weld overlay does the pipe need to be PWHT?
I did look on the NACE MR0175/ISO 15156 para A.2.1.5 and did not get a clear answer to my questions.
Any comment and clarification refering to NACE and experiances in the past appreciated.

RE: Fabrication of CRA overlay welded pipeline for Sour services

1. Refer to ISO 15156-3, A.13.1, paragraph 2
2. Refer to ISO 15156-3, A.13.1, paragraph 2

Steve Jones
Corrosion Management Consultant

http://www.linkedin.com/pub/8/83b/b04

All answers are personal opinions only and are in no way connected with any employer.

RE: Fabrication of CRA overlay welded pipeline for Sour services

Enjoy the hot cracks when weld overlaying 825 over carbon steel.

RE: Fabrication of CRA overlay welded pipeline for Sour services

(OP)
Hi Steve,
Thanks for your post. Actually I was looking to have your interpretation regarding the necessity of NACE comply material where we are using weld overlay in sour services and moreover if stress relief is required for CS overly with alloy 625 for sour services.
NACE MR0175/ISO 1516 part 3 clause A.13.1, paragraph 2 is not clear enough.
Can you provide your interpretation for captioned para more in detail.

Stanweld
We are going to use alloy 625 for weld overlay and not alloy 825. Good point.

Thanks

RE: Fabrication of CRA overlay welded pipeline for Sour services

ISO 15156 is not a complete menu of decisions, much as most people would like, and a great deal is left to the 'end user' to make the call on. Thus, I cannot provide an interpretation because I am not the end user and I do not have the complete array of information necessary to judge the risk and make the call. All I would proffer is: having deposited a CRA, think long and hard about potentially damaging it with a heat treatment; on the other hand, achieving compliance for the carbon steel could be the difference between a leak and a rupture should the CRA be breached. Good luck with your deliberations.

Steve Jones
Corrosion Management Consultant

http://www.linkedin.com/pub/8/83b/b04

All answers are personal opinions only and are in no way connected with any employer.

RE: Fabrication of CRA overlay welded pipeline for Sour services

We have had two Customer's order Alloy 625 weld overlayed, line pipe for similar applications. We did the field welding construction. Neither required PWHT or HIC/SCC testing of the base material.

RE: Fabrication of CRA overlay welded pipeline for Sour services

(OP)
Stanweld and Sjones,
Thanks for your comments.

RE: Fabrication of CRA overlay welded pipeline for Sour services

Stanweld, if you only did joining of the pipe it may have been buttered, thus requiring no pwht. Completely depends on what strength and alloy is being clad if pwht is required or not.

RE: Fabrication of CRA overlay welded pipeline for Sour services

OGMetEngr,
Per the contract specifications, we field welded with E/ERNiCrMo-3 (I would have up-alloyed for the service). PWHT was not required by B31.3, the applicable Code. Base pipe material was seamless carbon steel. I did review the O.L. WPS of the fabricator and did have the contract specs for the pipe.

RE: Fabrication of CRA overlay welded pipeline for Sour services

Hi Mateeng,

You need to look through clause 5.4,of API-5LD, 2009 for Heat Treatment. PWHT following CRA weld overlay could be asked by the client subject to base materials being used and design requirements . C.S pipes may be exempted from PWHT following weld overlay subject to project requirements.All testing (both mechanical and chemical) requirements are clearly specified in API-5LD and should be met.

Thanks

Pradip Goswami,P.Eng.IWE
Welding & Metallurgical Specialist
Ontario, Canada.
ca.linkedin.com/pub/pradip-goswami/5/985/299


Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources