INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Pre-heat/PWHT question

Pre-heat/PWHT question

Pre-heat/PWHT question

(OP)
Material type: SA-516-70
Material thickness: 1.75"
Code of Construction: ASME SEC VIII DIV 1 2004 ED/ADD

We are performing a repair of a tube sheet. The repair is due to a .020" deep steam cut on the gasket surface roughly .5" long. UCS-56 only addresses "welded joints". I have no welded joint, only an addition of metal to the tube-sheet.

1) Am I looking in the wrong location in the code book?
2) Would the thickness be governed by the weld depth, or the actual thickness of the base metal?
2) If the thickness is the actual base metal (tubesheet), is preheat in lieu of PWHT an option without going the route of one of the NBIC alt. methods?

Thanks in advance.

RE: Pre-heat/PWHT question

This would be a weld repair, and based on your question would be applicable to an in-service item and not under the code of construction (ASME). Look at UW-40 (f) for guidance related to PWHT requirements and nominal thickness. All the answers to your questions can be found in UW-40(f). By the way, the NBIC provides guidance for weld repairs to in-service items, I would suggest you follow it. You might be able to use Welding Method 1.

RE: Pre-heat/PWHT question

(OP)
Similar question. People always refer to NBIC, which refers you to the original code of construction. That's why I was looking in Sec VIII.

SA-337-5 CL. 2 Tube sheet
4.375" thick
Code of Construction: ASME SEC VIII D1 1986/1885 ADD

Small repair to gasket sealing surface. .125" in depth. Where would the requirement to PWHT be listed in regards to weld repair? This is neither shell, nor channel, nor head. It is the tube sheet, and is not listed as PWHT. It is not a welded joint. Jurisdiction is pointing back at me to answer my own question. AI shrugs his shoulders and say preheat in lieu of. NBIC says no to preheat in lieu of PWHT for P5B materials. I can't believe this small issue would be so difficult to resolve in this day of severe oversight. Would this fall into the realm of AI approval makes everything Kosher? I am split on the issue and could sure use some guidance. I am off to search through the interpretations again. Thanks in advance.

RE: Pre-heat/PWHT question

The NBIC refers back to the original code of construction for technical details IF they are applicable to the repair or alteration. I don't understand what is so difficult about this repair. It is considered a weld repair, you follow the preheat requirements in the code of construction. You look at the deposit thickness (not the tubesheet thickness) of the repair weld and if the original code of construction exempts you from PWHT based on nominal thickness for the base material P-No, so be it. If the original code of construction does not address it you look at one of the weld repair methods in Alterative Weld Repair Methods in the NBIC. This is very straight forward.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources