INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Smooth Dowels at Retaining Wall Joint

Smooth Dowels at Retaining Wall Joint

Smooth Dowels at Retaining Wall Joint

(OP)
I've got a site retaining wall that I've designed. It varies in height from 4' tall to about 12' tall. The wall is nearly 200' in length.

I know that I need vertical joints in the wall at 20' or so on center in order to deal with shrinkage of the concrete once it is poured.

I have drawn a detail for detailing how the vertical wall joint is to be built. I am having a beveled piece of wood placed on the inside face and outside face of the wall, inside the form, in order to create a vertical groove in the wall, where we want joints.

I also want to provide smooth dowels across each joint to help prohibit differential movement between each segment of wall.

Looking at ACI224, they reference PCA from 1975, and say that the recommendation for the amount of steel required as a dowel is for 0.015 of the cross sectional area of the concrete. In other words, if I have a 16" thick wall, the area of steel dowel needed by this method would be:

(16" wall thickness) x (12" of wall height) x (0.015) = 2.9 square inches/foot of wall height

Which to me, seems VERY excessive.

I was thinking more along the lines of a 3/4" diameter smooth dowel at 18" o.c. Just by feel, I can't imagine that that amount of dowel steel across the joint wouldn't be enough.

What dowel size and spacing do you guys use across a joint like this?


RE: Smooth Dowels at Retaining Wall Joint

I think your thinking is about right. Not familiar with the reference you gave, but it must be referring to a vastly different requirement.

RE: Smooth Dowels at Retaining Wall Joint

Match your horizontal bar spacing.

I had a concrete contractor show me how he used a PVC sleeve with the rebar slid in, on one side of the joint only.

Worked real slick, definitely allowed for shrinkage, and it kept the wall true. A #4 will do it for your wall size. Smooth rebar kind of bonds still.. with a thick wall PVC sleeve, it definitely slides. You can do this type of joint on a non-shear wall like a site wall your describing.

I would recommend tightening your control joints some. maybe 15'-0" max.. or a 1:1 ratio of the wall height. I know that there are larger recommendations than this out there, but from my experience, a nice tight control joint spacing not only looks good, but guarantees a clean wall. (unless the concrete mix is just bad and too wet.). Call for a 3/4" chamfer on each side of that vertical joint, I like that look.

#4 dowel x 24" @ 18", 12" long PVC sleeve on one side.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources