INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Cost difference between f'c = 4 vs 5 ksi

Cost difference between f'c = 4 vs 5 ksi

Cost difference between f'c = 4 vs 5 ksi

(OP)
We have some 12'x12'x3' footings that we originally spec'd out as 4 ksi. For the sake of appendix-D (tension on ABs) I think we need to go to 5 ksi. Is there a huge cost difference between the two? Obviously its going to be more concrete for the later.

RE: Cost difference between f'c = 4 vs 5 ksi

Not much. Probably less than $100(US) per footing.

RE: Cost difference between f'c = 4 vs 5 ksi

Ron is more than likely close. Delivery, etc should not increase. Call a few yards and ask them.

RE: Cost difference between f'c = 4 vs 5 ksi

And it is more CEMENT not concrete

Richard A. Cornelius, P.E.
WWW.amlinereast.com

RE: Cost difference between f'c = 4 vs 5 ksi

Work with your ready-mix plant. Maybe their "4 ksi" mix has historically reached 5 ksi, or 4.7 ksi.

My favorite f'c = 4300 psi mix from my local ready mix plants typically reaches 5500+ psi at 28 days (which is fine for my application).

RE: Cost difference between f'c = 4 vs 5 ksi

If the job hasn't been priced yet, should be a minimal difference. But you have the potential for some confusion if that's the only place where it's required.

RE: Cost difference between f'c = 4 vs 5 ksi

I got a quote last year in the northeast U.S. of $5 per cubic yard to increase f'c by 1000 PSI. Therefore, Ron's estimate is pretty close. I'm surprised to see 5 KSI footings though. I have never seen anything other than 3 KSI, and they are sized to work for that concrete strength. Is that becoming more common with Appendix D? We usually try to find a work-around in the anchor design to meet App. D with 3 KSI concrete.

RE: Cost difference between f'c = 4 vs 5 ksi

Higher concrete strengths (4500 psi or more) in footings is becoming the norm in California for several reasons. High alkali soils, soil moisture and LRFD designs are all considerations. Going to 4500 psi seems to be the quick easy way to solve all those issues.

LonnieP

RE: Cost difference between f'c = 4 vs 5 ksi

Embellishing on LonnieP's post, if you have aggressive soils you need 4500 psi concrete. See ACI 318, Table 4.3.1. I'm afraid that those 3000 psi mixes will be going the way of the dodo.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.