INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Benching or strip footing on a grade?

Benching or strip footing on a grade?

Benching or strip footing on a grade?

(OP)
I've recently did a design for box culvert with an open base that had to protect and allow access to pipes under a road. The pipes travel at a grade of 1 in 8 down a hill. I've designed using a strip footing which has a retaining wall at the end with a key. I found the box culverts were stable with a friction factor of 0.3 which is concervative for concrete on concrete or on the rock with has an allowable gbp of 400kpa. The fill varies across the road from 300mm to 3m  My question is at what grade would people change the design from a strip footing down a slope to benching at various levels? I was thinking that 1:8 is the limit based on safety factor and friction.
 

RE: Benching or strip footing on a grade?

I would think the controlling factor would be how will this be formed up. Working on an incline, it would seem that paralleling the forms with the main body of the box with the footings would be easiest to build. That should control.

RE: Benching or strip footing on a grade?

(OP)
Thanks for the reply. That is the method I went for. The ground was cleaned and blinding poured. The strip footing were made oversized in depth. The box culverts I should have added were precast. The backfill of the footing was stabilized sand inside the culvert due to difficulty compacting and the outside was road fill. Then locked in with a retaining wall at the end of the strip footing with a large key.

I went for construct ability of a single long strip footing rather than having benches every 2.4m or 4.8m along the slope.

It was just something I've never seen much off, only seen in mine portal entrances at this grade or storm water drainage which has a shallower angle due to water control.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources