INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Technical Bid evaluation

Technical Bid evaluation

Technical Bid evaluation

(OP)
Dear Sirs,

i have to do several technical bid evaluation for gear, canned and reciprocating type pumps.
Could you give me an excel file for example of a technical bid comparison / evaluation for those pumps type?

Thanks

RE: Technical Bid evaluation


What kind of service are you looking at that would compare a gear pump and a canned (motor or VTP??) pump?? PD vs. Centrifugal?? Not sure an Excel file is going to do the trick.

Can you tell us anything about the service and why these totally different style pumps are being considered for same?

RE: Technical Bid evaluation

The way I read the post, I think the OP is spreading several pumps, and each spread is comparing like pumps with like pumps, not necessarily spreading different pump types against each other on one spread.

RE: Technical Bid evaluation

AH yes, probably right, my bad.

RE: Technical Bid evaluation

(OP)
Dear DubMac

before answering please read carefully. if I was not able to explain properly, let me note!

i have to do a technical bid evaluation for 5 gear pumps, 5 canned and 5 reciprocating pumps.
For 5 gear: what are the parameters to consider in the process of tabulation and what I have to compare?I ask for information to the seller: I want the pump made ​​in this way. He gives me the pump made ​​it this way.

For 5 canned: what are the parameters to consider in the process of tabulation and what I have to compare?I ask for information to the seller: I want the pump made ​​in this way. He gives me the pump made ​​it this way.

For 5 reciprocating pumps: what are the parameters to consider in the process of tabulation and what I have to compare?I ask for information to the seller: I want the pump made ​​in this way. He gives me the pump made ​​it this way.


Regards

RE: Technical Bid evaluation

Basically, you need to take out of your data sheet or ITT the key data you need to be confirmed / supplied.

This would include:
design code, material offered, size, weight, pump duty, compliance with specification, motor size and duty, voltage, pulsation limit, no of pistons, where it is built, testing included, etc.

You can only evaluate what info you have requested. Some will be data, some included or not included.

If you had a requirement, list that in the first column.

My motto: Learn something new every day

Also: There's usually a good reason why everyone does it that way

RE: Technical Bid evaluation

I understand you work on engineering company or project area and you have different 03 pumps packages.
Pump packages are not for the same services.
But when you define this bid, did you define technical evaluation method?

RE: Technical Bid evaluation

If you are working on an EPC company, they have their standard forms.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources