INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Plant installation

Plant installation

Plant installation

(OP)
If the client is doing the design of the plant and equipment who should state where the field welds will be done and any modifications of the equipt for installation? The Client or installation contractor?

RE: Plant installation

The client ... obviously.
But from the quality of design work I see these days, I could certainly understand why a contractor might have a different opinion. I often do.

Independent events are seldomly independent.

RE: Plant installation

"The client is doing the design of the plant and equipment" doesn't give me a warm, fuzzy feeling. Who did the detailed (not conceptual) plant/equipment layout? Who did the piping design? Who did the stress analysis?

Good luck,
Latexman

Need help writing a question or understanding a reply? forum1529: Translation Assistance for Engineers

RE: Plant installation

I am also confused....

Field welds locations of piping systems USUALLY (but not always)are determined by the reasonable spool size necessary for transportation to the field site.

In my experience, spool transportation limitations indirectly determines about 60 to 80% of filed weld locations.

Add on another 15-20% of field welds that are determined by last minute changes and field routed piping.

For new or replacement piping systems that are to be installed into an existing, congested plant...... the percentage of field welding could be 80-100%.

Sill confused by the OP's phrase :"any modifications of the equipt for installation"..... What exactly is meant here ?

RE: Plant installation

Utimately, BI is right, the client has to sign off on the work, but I wonder in this case who did the detailed piping work. THATs who has the knowledge to really make the calls.

Good luck,
Latexman

Need help writing a question or understanding a reply? forum1529: Translation Assistance for Engineers

RE: Plant installation

(OP)
Ok thanks for the answers. I remember on the isometrics from the final design usually have the welds on ( this is how in our last job we started a weld register). But if the isometrics come from the final design/ model then does the installation contractor have any say in where these welds are?

Is final design done usually before the installation contractor is found?

RE: Plant installation

I wasn't thinking so much of equipment fabricated offsite and transported in, in which case I would tend to agree with MJCronin. If it was for work to be fabricated on site, I'd say definately the client would be in a good position to decide, although he should be prepared to pay for the wrong decision. In any case it is not a matter of who has more authority over the other, but the best way to do it. That should be agreeable without resorting to the "It's my football" thread. If the contractor really doesn't agree with the ultimate decisiion, then his recourse would be to state his intent to claim for extra payment, justified by determing a cost for each option of field joint locations being considered and writing up a change order for the difference.

Independent events are seldomly independent.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources