INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Waste Rock Dump

Waste Rock Dump

Waste Rock Dump

(OP)
I am new on tailing dams though have some experience in hydro projects.

In a project they are dumping waste rock inside a valley to allow tailing deposition on one side. The waste rock may include boulders of 1 to 2 feet diameter. The height of the dump would be about 60 m. The client does not mind if water infiltrates through the dump to the d/s. I think nevertheless that the silt up phenomenon would make a seal over time. Could someone direct me to a design manual or methodology. I am familiar with the design of embankment dams with clay core etc but not with a waste dump placed with no compaction.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources