×
INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Copying a Sheet from drafting mode between different revisions of the part

Copying a Sheet from drafting mode between different revisions of the part

Copying a Sheet from drafting mode between different revisions of the part

(OP)
Hi All,

NX8.5

TC8.3.3

If I have a part , which has 3 revs. I create a new rev 04.. simultaneously, my team member creates a rev 04 in native and sends it back to me with drawing updates.. suppose I had 3 drawing sheets and he added 4th sheet..

Now I do not want to replace his part with mine in team center. But I would like to add that sheet 04 to my drawing …

How can I do this? Is this possible OOTB? if not , is there a way to get this through NXOpen programming? Has any one run into this kind of issues?

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources