I am reviewing a set of plans that constructs a new road over an existing road. The existing road is on a 5 percent grade and shows a lot of erosion and some bare rock outcropping. When it was first built it caused a lot of flooding to the area downstream at the bottom of the hill. The 22-foot wide new road road will cover the old road with 9-inches of compacted TxDOT A1 or A2 Base Course material. Also, the design calls for small ditches on each side of the road. Crown is drawn on plan, but cross-slope is not specified. The designer is regrading the upstream area so that the volume of water going to the road is reduced.
I have concerns that the Base Course material will be washed out at the first good rain. I am going to ask the designer to provide his design analysis. Can someone give me some tips on what to look for to make this type of road successful? At this point in time we cannot afford HMAC or concrete, so really need to work with cheaper materials.
Thanks In Advance For Your Support!!!
I have concerns that the Base Course material will be washed out at the first good rain. I am going to ask the designer to provide his design analysis. Can someone give me some tips on what to look for to make this type of road successful? At this point in time we cannot afford HMAC or concrete, so really need to work with cheaper materials.
Thanks In Advance For Your Support!!!





RE: Using Base Course for Road Surface
As a compromise, consider injecting asphalt emulsion into the base course as it is placed or add cement to stabilize. You can also combine the two for a durable surface/base. Keep in mind that you might not have a lot of skid resistance.
Another option is to place a single or double chip seal after placement of the base.
RE: Using Base Course for Road Surface
The TxDOT A1 base is supposed to be good unconfined when its compacted, but the A2 base-not so much.
RE: Using Base Course for Road Surface
RE: Using Base Course for Road Surface
RE: Using Base Course for Road Surface
You generally want to use the same gravel material used for a basecourse, but with more binder (fine) material.
Require at least a 3% crown.
Chip-seal, as mentioned above would be preferred, but if costs are truly restrictive you can consider a soil stabilization material such as mag chloride. It will significantly decrease road maintenance.
RE: Using Base Course for Road Surface
As for cross slope. Ensure it is not 0%. That is poor design and will shorten life of road. 2% is typical for paved and 3% for gravel, normally crowned but can be sloped all the way across too depending on the road alignment, terrain and all.
RE: Using Base Course for Road Surface
I'm not familiar with Texas DOT specifications, but if A1 and A2 are a base course materials for a paved road, you'll need to surface it. Paved road base course gradation makes a lousy gravel road. Good material for a gravel road has more fines in it. This, of course, means it's a lousy base for a paved road.
The Cornell (Univeristy) Local Roads Program has some good info on gravel road materials. If this is a public road, and assuming you're in TX, the people at the equivalent Texas program would be a good resource, too.
RE: Using Base Course for Road Surface
Fahad
Editor at http://cescientist.com | A blog for Civil Engineers