PSV Minimum Blowdown
PSV Minimum Blowdown
(OP)
Hi everyone,
Where can I find the minimum blowdown for PSV according to ASME VIII Div.1? Is it the same as ASME I (not be less than 2%)?
Thanks in advance.
Where can I find the minimum blowdown for PSV according to ASME VIII Div.1? Is it the same as ASME I (not be less than 2%)?
Thanks in advance.




