Equivalent technique for " Unuse all " option that is available in I-deas Assembly Configu
Equivalent technique for " Unuse all " option that is available in I-deas Assembly Configu
(OP)
Hello
I am a long time I-deas user now shifted to UG NX 7.5
In i-deas while working with assembly configuration, there is an option called unuse all. If we use this, every new positions of child parts( Even child parts of sub assemblies) will be stored in the top assy.
Is there any option equivalent to this option in NX 7.5 Assembly arrangements.
I am a long time I-deas user now shifted to UG NX 7.5
In i-deas while working with assembly configuration, there is an option called unuse all. If we use this, every new positions of child parts( Even child parts of sub assemblies) will be stored in the top assy.
Is there any option equivalent to this option in NX 7.5 Assembly arrangements.





RE: Equivalent technique for " Unuse all " option that is available in I-deas Assembly Configu
To find out more about this, go to the NX Help files and look in
Design -> Assemblies -> Component position commands -> Override a component position
John R. Baker, P.E.
Product 'Evangelist'
Product Engineering Software
Siemens PLM Software Inc.
Industry Sector
Cypress, CA
Siemens PLM:
UG/NX Museum:
To an Engineer, the glass is twice as big as it needs to be.
RE: Equivalent technique for " Unuse all " option that is available in I-deas Assembly Configu