INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Modelling foundation piles in SAP2000

Modelling foundation piles in SAP2000

Modelling foundation piles in SAP2000

(OP)
Hi everyone,

I have a building project in hands in which is required to simulate several foundations conditions:

1 - Foundation slab among piles;

2 - Only Piles.

My doubdt relies on the the best way to simulate those referred piles. Until now i'm modelling the piles "only", by assigning "winkler" springs. Is it the correct way?

I'm also asking this, because, in the reality those piles might get to its stress limits and, in that case part of the loading goes to the slab. That's why i'm not sure if the way i'm simulating is the correct way.

The only data received from the foundations team (it is another company) is the pile stifness and its strees capacity.

Thank you,

RE: Modelling foundation piles in SAP2000

The answer is "it depends". Modeling piles as springs is perfectly reasonable in many foundation slab designs. Compare max vertical reactions with the pile capacity limits. You may also need to check for punching shear, depending on the thickness of your foundation and the loading.

If you were designing the pile, you could model it as a frame "column" element, just make sure that you add enough joints along the pile length to enable you to assign soil springs as a function of depth. With a frame/column element, you can not only analyze but also design required reinforcement.

CSI's SAFE program analyzes and designs slabs and foundation including design of required reinforcement and punching shear checks per code.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources