INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Scoring

Scoring

(OP)
I uploaded a picture of poured concrete steps. I didn't realize the contractor didn't put a score mark at the bottom of the steps in case of cracking. My question is "should there be a score mark at the bottom of the steps?" 4000 PSI concrete

I have a picture of the forms also.

RE: Scoring

There should have been an isolation joint there; however, it is not critical. You will get a crack there, but it will likely occur at the horiz/vert transition. Scoring would have made it a bit neater, but you would get the same result.

RE: Scoring

(OP)
I was thinking about getting a saw and doing it.

RE: Scoring

You can do that, but likely the crack has already occurred....look very, very closely!

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources