INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Genset Overload

Genset Overload

Genset Overload

(OP)
We have a 1MW natural gas genset connected to the plant load via a breaker type ATS and to a load bank via a 1600A breaker. It is intended to keep the load bank breaker closed in order to keep the genset loaded to at least 50%. Load bank loads will adjust automatically in steps depending on the loading conditions.

There is a chance where the genset could be in testing and normal power is lost in which case the genset would be briefly overloaded. The genset output breaker is 2000A.... I expect that the genset would stall before the breaker opens. Either way, does anyone see a problem beyond the inconvenience of having to close the breaker or restart the genset?

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources