INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

air lifting technique

air lifting technique

air lifting technique

(OP)
hi,
some one explain the process of air lifting technique in piles and why it is used &how to do that

RE: air lifting technique

In my experience an air lift is a vertical pipe with a smaller pipe or hose beside it and a U-shaped tube to jet the air up into the big pipe. The assembly is lowered to the bottom of a water-filled excavation or a slurry-filled pier hole. When the air is turned on, water and air will spew out the top, bringing mud, gravel, even cobbles with it. It is a tool for cleaning the bottom of a pier or a cofferdam. It can also be used to remove slurry that has become too sandy while adding fresh slurry at the top.

RE: air lifting technique

(OP)
thanks for ur reply sir ,
can u explain about the causes and reasons for choking in the piles?
and also explain about the remedial measures for it

RE: air lifting technique

I'm not sure what you mean by "choking". Can you give us more information, such as the type, diameter, and length of the piles and what the "choking" involves?

RE: air lifting technique

(OP)
what i came to know from the field is while concreting (bored cast-in-situ pile)using tremie pipe if the concrete does not go through or if it get struck up in the middle of concreting they call it as a choking

ours is 1.2 m dia,and depth is 45m

RE: air lifting technique

There is no relation between your "choking" and air lifting !Next time start another post !

If concrete doesn't go through the tremie pipe, causes can be
- diameter of tremie pipe is too small ( 8 inches ID minimum)
- too much embedment of the tremie pipe in the concrete ( min is 2 to 3 m and actual should be kept close from min )
- slump of concrete is too small (ideal is around 180 mm, with 130 mm likely to "choke")

RE: air lifting technique

In regard to the tremie pipe, I am assuming that you are using a concrete pump to deliver the concrete under water and as the height of concrete column is getting higher under water, you should also raise the tremie pipe while its outlet remain slightly embedded in the poured concrete so that no water gets trapped under the poured concrete; it's a procedure learned in the field by those who have not had prior experience with this technique.

RE: air lifting technique

This thread is about airlifting. For an explanation, see Chapter V of Harold V. Anderson's Underwater Construction Using Cofferdams, Page 158, Airlifts, from Best Publishing Company, 2001, www.bestpub.com. There is a sketch and several paragraphs describing the operation.

www.PeirceEngineering.com

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources